Bryansk, Bryansk, Russian Federation
Today there is an inconsistency issue between tak-ing the management decisions and the required production condition at machine-building enterprises, including high production costs, long period of a production cycle and the operational delays. For solving the problem the author of the work has investigated production and management at machine-building enterprise on the basis of system analysis. The approach for coordinating purposes and indicators at the strategic, tactical and operational level of management at machine-building enterprise is offered. The proposed technical solutions are introduced in CJSC CC Bryansk Engineering Plant and universal theu can be applied at all machine-building enterprises of the country.
enterprise, management, purpose, system, production, indicators
1. Konovalova, G.I. Methodology of intercompany management based on system integration / G.I. Konovalova // Management in Russia and abroad. -2015. - №2. - P. 109-118.
2. Konovalova, G.I. Methodology of intercompany management based on system integration / G.I. Konovalova // Management in Russia and abroad. -2015. - №5. - P. 121-128.
3. Konovalova, G.I. Development of intercompany management methodology: Monograph / G.I. Konovalova. - Bryansk: BSTU, 2014. - 375 p.